PROJECTS


  • Past experience of S-DEC’s personnel includes the management and development of Jabatan Penilaian and Perkhidmatan Harta’s Intergrated Valuation Information System, Water GIS for Jabatan Bekalan Air Terengganu and active involvement in the feasibility study of Malaysia’s National Infrastructure for Land Information System (NaLIS) project from 1994 – 1995.

  • Upgrade of a CAD mapping system to water GIS and data conversion for Lembaga Air Perak (Perak Water Board) in 1999.

  • For IT project management and consultancy, S-DEC was appointed by a local IT company in 1999 as group project manager for the implementation of Keretapi Tanah Melayu Bhd.’s Y2K project which included the management and monitoring of project teams from international and local companies.

  • Data Conversion and development of a Water GIS (SAJHGIS) Phase 1 project for SAJ Holdings Sdn. Bhd. (SAJH) in 2001. About 15000 kms of pipelines and more than 1 million land-base objects were converted during Phase 1 & Phase 2 project (2003). The system now has over 25000 kms of pipelines.

  • Upgrade of SAJHGIS to Integrated Water GIS (IGIS) in 2005 for SAJH, which included integrating SAJHGIS with Water Quality System (WaQIS), Billing Information System (BIS), Production Control System (PCS), Job Management System (JMS), Remote Monitoring System (RMS) using Web-based GIS technology.

  • Upgrade of SAJH’s IGIS to fully Integrated Water Supply Management System (WSMS) in 2007 which included development of an Emergency Alerts Response System (EARS). EARS is a single fully automated web-based system for SAJH's Info Center. It combines 5 of the 6 major systems described above, i.e. SAJHGIS, WaQIS, JMS, RMS & PCS, displaying locations and details in a large LCD TV of alerts such as water levels from reservoirs, water quality violations from sampling points, active and scheduled maintenance information from Water Treatment Plants and major pipe burst from Job Management System. No user interaction is required for this highly customised integrated system. A Field Round Trip System (mobile) GIS was also implemented in 2007. In 2009, included a new Network Assets Management system (NAM) into Integrated Water Supply Maganement System (WSMS)

  • Data Conversion of basemap and gas facility data for Gas Malaysia Sdn. Bhd. for sites in Selangor, Johor, Melaka, Kedah, Pulau Pinang, Perak and Negeri Sembilan. GPS surveys were carried out to capture locations (and attributes) of major gas customers throughout Malaysia.

  • Implemented data conversion and document archiving for Johor Port Bhd.

  • Implemented data enhancement services & geo-referencing of consumers for system integration and network modelling for Syarikat Air Melaka Bhd..

  • Implemented Integrated Water Supply Management System for Sibu Water Board (SWB) in 2009.

  • Development of Project Submission & Monitoring System (PSMS) for water supply agencies in 2007. Currently installed at SAJH for Johor state. This Web-based system automates the complete workflow in the application & approval of new development & Renewal projects which include submissions by developers, dispatch of project submission documents between HQ and district offices, review, approval and notification. It also produces information on estimated new water demand, computation of contribution money and tracking of payments. Performances of officers involved in review and approval of submissions are monitored.

  • Development of Non-Revenue Water Management System (NRWMS) for water supply agencies in 2011. Currently installed at SAJH for Johor state. NRWMS is interfaced to most of SAJH’s major backend systems, including its water GIS and automated data management & compilation of raw & master data from these systems required for generation of Water Balance report, Rolling NRW report, ILI report and many other KPI related reports.

  • Site survey and water consumers geo-coding for NRW critical DMZs in Batu Pahat district for SAJH (2011).

  • Implemented Integrated Water Supply Management System for LAKU Management Sdn. Bhd. (LAKU) in 2013, which is an on-going project. Water Supply Areas include Miri, Bintulu & Limbang.

  • Augmented Reality Mobile GIS project for LAKU Management Sdn. Bhd. in 2014.

  • Augmented Reality Mobile GIS project for SAJH in 2014.